ENERGY PERFORMANCE
SERVICES
The generic services include preliminary energy
survey of the facility, Investment Grade Audit
and conceptual design, detail design and project
specification, supervision of EE project implementation,
testing and commissioning and Monitoring and Verification
(M&V).
To begin with, a proper energy survey, which
includes site familiarization, physical site audit
and data logging that, may take 6 to 8 weeks with
the mobilization of our energy engineers, monitoring
and data logging equipment to the plant. All these
are done at our cost to determine the energy consumption
patterns, efficiency, formulation of Energy Performance
Indicators (EPI) and saving potentials. Having
completed the said, we can therefore advise our
clients on are the areas of improvements to reduce
energy costs at their facility.
The M&V exercise will be used to gauge the
performances of the provided services or implemented
projects. During the entire period, Lumentech
will carry out monthly M&V activities to justify
the savings.
OPPORTUNITIES FOR ENERGY
COST CONTROL
The following are typical energy efficiency improvement
opportunities that are normally covered during
the services:
 |
|
Process Heat Recovery
|
| |
|
Heating Process Improvement
|
| |
|
Furnace Combustion Optimization
|
| |
|
Resource Recovery & Waste Minimization
|
| |
|
Water Recycling
|
| |
|
Alternate Energy Sources
|
| |
|
Demand Side Management
|
| |
|
Electricity Tariff Analysis & Power
Factor Correction
|
| |
|
Multiple Generation
|
| |
|
Motor Drives & Pumping System Optimization
|
| |
|
Utility - Steam, Air Conditioning, Water,
Compressed Air, Chilled and Cooling Water
systems optimization opportunity
|
Example
of typical measures:-
|
No.
|
Typical
Measures
|
Application
|
|
Type
|
Industrial
Processes
|
Commercial
Buildings/Hotels
|
|
1
|
Monitoring
and targeting technique for electricity
consumption and demand control
|
Electricity
procurement
|
YES
|
YES
|
|
2
|
Rationalisation
of the production of compressed air
|
Facility
- Air Compressor
|
YES
|
|
|
3
|
Elimination
of pressure drop, quick demand surge, moisture
and reduce air compressor loading
|
Facility
– Air Compressor
|
YES
|
|
|
4
|
Pump
& Fan system retrofitting by eliminating
high TDH, modulation according to end-use
load and scheduling operation.
|
Facility
- Electricity
|
YES
|
YES
|
|
5
|
Electric
Motor Management
|
Facility
- Electricity
|
YES
|
YES
|
|
6
|
Accurate
temperature and humidity control to suit
the need for air conditioning
|
Facility
-ACMV
|
YES
|
YES
|
|
7
|
Improve
performance of cooling towers and chillers
|
Facility
-ACMV
|
YES
|
YES
|
|
8
|
Variation
of chilled water flow rate according to
the load
|
Facility
-ACMV
|
YES
|
YES
|
|
9
|
Optimization
of multiple chiller’s operation
|
Facility
-ACMV
|
YES
|
YES
|
|
10
|
Use
of renewable sources of energy
|
Energy
Procurement
|
YES
|
YES
|
|
11
|
Use
of low thermal mass material
|
Thermal
Process
|
YES
|
|
|
12
|
Advanced
Refractoriness and Insulation
|
Thermal
Process
|
YES
|
|
|
13
|
Efficient
furnace control
|
Thermal
Process
|
YES
|
|
|
14
|
Air/fuel
control for efficient combustion –
boilers / Furnace
|
Thermal
Process
|
YES
|
YES
|
|
15
|
Batch
Preheating& control of moisture content
|
Thermal
Process
|
YES
|
|
|
16
|
Use
of alternative fuel source for firing
|
Boilers/furnace/dryers
|
YES
|
|
|
17
|
Boiler
efficiency improvement & waste heat
recovery
|
Thermal
Process
|
YES
|
YES
|
|
18
|
Steam
conservation and rationale use
|
Thermal
Process
|
YES
|
YES
|
|
19
|
Generation
of LP steam using alternative methods
|
Thermal
Process
|
YES
|
YES
|
|
20
|
Drying
system optimisation and increase production
yield by reducing cycle time through efficient
moisture removal
|
Thermal
Process
|
YES
|
|
|
21
|
Flue
gas heat recovery using air pre-heater/economizer
|
Thermal
Process
|
YES
|
YES
|
|
22
|
Heat
recovery from high temperature effluent
|
Thermal
Process
|
YES
|
|
|
23
|
Conventional
/ Absorption Heat pump for drying, simultaneous
heating and cooling applications
|
Thermal
Process
|
YES
|
YES
|
|
24
|
Mechanical
recompression of low temperature vapour
for higher heating application
|
Thermal
Process
|
YES
|
|
|
25
|
Ceramic
regenerative burners, radiant tube self-recuperator,
jet and radiant burners application for
efficient combustion
|
Thermal
Process
|
YES
|
|
|